|
|

Build Your Online Product Catalogs?
| Product Name: |
Slab formwork shoring system Type B
|
| Supply Ability: |
90000tons |
| Related proudcts |
steel scaffolding, cuplock scaffolding, |
| Specifications |
main beam and sub beam |
| Price Term: |
FOB |
| Port of loading: |
TIANJIN XINGANG |
| Minimum Order |
23 |
| Unit Price: |
800 |
|
| Slab formwork support system consists of main beams and sub beams,cold steel material.The main beam can be extended adjustable to meet framing different size rooms/halls. It substitutes for timbers without any iron wires and nails to form better blocks and nice surface flatness.It is recyclable for 300 times to increase builing efficiency. |
| Company: |
XING MIN WEI YE Architecture Equipment Limited Corporation
|
| Contact: |
Ms. Hope Xu |
| Address: |
Gold shore development district |
| Postcode: |
066600 |
| Tel: |
86-0335-2208895 |
| Fax: |
0335-2889966 |
| E-mail: |
|
|
|
|